Industry Day for Hollywood Burbank Airport’s Elevate BUR Project

The Burbank-Glendale-Pasadena Airport Authority is hosting Hollywood Burbank Airport’s (BUR) Industry Day in anticipation of procurement of a Design-Build firm for the replacement passenger terminal project, now called Elevate BUR.

Elevate BUR includes: the replacement of the current 14-gate terminal; construction of the aircraft apron and taxiway connectors; parking structures, ground support equipment and air cargo facilities; airport administrative space; an aircraft rescue firefighting building; utilities; and roadways.

Elevate BUR will bring the airport into compliance with current airport design standards. It is also an opportunity, 90 years in the making, to create a modern, sustainable, convenient facility that will continue to serve the community for decades to come.

The Authority has decided to pursue a Progressive Design-Build model for delivery of the project. Industry Day will provide up-to-date information on the program, allowing for discussion with Airport Staff and consultants who have been collaborating on the program so far, and provide a networking opportunity for firms interested in collaborating during the selection process.

The event is free to attend, but is recommended for Design-Build team principals at this time. Another event, for trades and material suppliers, will take place at a later date. Please join us:

WHEN:
Wednesday, October 30, 2019
9:00 a.m. to 12:00 p.m.

WHERE:
Los Angeles Marriott (Burbank Airport) Convention Center
2500 N. Hollywood Way, Burbank, CA 91505

Please RSVP on Eventbrite as soon as possible as space will be limited.

 

This entry was posted in News. Bookmark the permalink.